Objectives of the STLD project
The main objectives of the STLD project are to
increase rice productivity by means of incentives for proper water management
planning based on farmers participation in line with the goals of the
Government to increase rice production outside Java Island and to find
solutions for technical, logistic and organizational limitations. These main
objectives are followed by the application of the three Project Components of
the STLD project.
The activities planned follow three main Project
Purposes:
1. Project
Component I: Assessment of Needed Hydraulic Infrastructure;
2. Project
Component II: O&M with Local Government and Water Users Associations
(P3As);
3.
Project Component III: Familiarization and
Implementation Farming System Technology.
The three Project Components have a strong link with
the solutions to the problems as formulated in this Workplan that are expanding
on the experiences in the LWMTL project and the prepared Technical Guidelines
of this project. A Logical Framework Matrix for these three Project Components
is presented in Annex I.
Project Component I. The project goals will be expressed in an advisory
report on the needed hydraulic infrastructure for the schemes in which the
pilot areas in West Kalimantan are located. This report will be prepared with
the involvement of the P3As, Local and Central Government. Intermediate results
for this goal are reached by:
1. Assessing
needed hydraulic infrastructure for mainly rice, but also other food crops
where appropriate in the schemes where the pilot areas in Kalimantan are
located. This goal is reached by activities including: final
selection of the pilot areas in West Kalimantan (1 in Sambas and 1 in
Pontianak), followed by an inventory of the conditions of canals and water
control structures in the concerned schemes. Expanding and updating of the
existing Data Base and Management Information System (MIS). This activity may
also generate data to enable the determination of priority rice development
areas that may be of use for the Regional Development Planning by the Local
Government. A measurable indicator is the evaluation of the costs for
implementing the needed hydraulic infrastructure in the selected schemes for
upgrading, the envisaged water management rules at secondary and tertiary
level, the possible effects on the aim to increase production, the resulting
annual costs and required organization of O&M at secondary and primary
level by Central and District Government and at tertiary level by the P3As;
2. Assessments
for needed inputs in the District Government budget for modernization/
installation of water control structures at tertiary and secondary level. This
goal is reached by activities including: evaluation of Participatory Rural
Appraisals (PRAs) with farmers for needed water control structures at tertiary
and secondary level, and coordination meetings with farmers/government. A
measurable indicator will be a report on recommended hydraulic infrastructure
at tertiary and secondary level, including water management rules at both
levels and the on-farm water management system to be implemented by the TAM
program of the Ministry of Agriculture;
3. Presenting
a budget proposal for implementing hydraulic infrastructure to Local/Central
Government for the pilot areas. This goal is reached by activities
including: assessment of needed water control structures at secondary and
tertiary level based also on a coordination with the Development Planning by
the Local Government. A measurable indicator would be a report to Local/Central
Government at the start of the yearly budget planning process, followed by
proposals for further developments in the future.
Project Component II. The project goals are expressed in the increase of
responsibilities and activities of the P3As. Further they are expressed by the
introduction of mechanization for routine and periodic maintenance in order to
reduce costs and the need for manual labour for canal maintenance. These trials
and demonstrations will be conducted in the pilot areas in South Sumatra. Intermediate
results for this goal are reached by:
1. P3As
able to handle the O&M at tertiary level in the pilot areas and District
Government Agencies that are able to handle the O&M at primary and
secondary level in the schemes where the pilot areas are located. This
goal is reached by activities including: reactivating/establishing, legalizing
of P3As in the pilot areas of West Kalimantan in such a way that they maintain
the tertiary canals and operate the structures in these canals according to the
agreed operation rule. In addition that they can enter in contracts with the
District Government Agency for maintenance activities at secondary and may be
even at primary level, or can take care for the operation of the water control
structures at secondary level, based on an agreed operation rule. Measurable
indicators would be the presence of trained and legalized P3As in the pilot
areas that are able to maintain the tertiary canals and to operate the
structures in these canals and District Government Agencies, responsible for
the schemes in which the pilot areas are located, that can organise adequate
O&M, especially at secondary level. An important external condition for the
success of the STLD project will be the sustainability of the O&M by the
P3As and the District Government Agencies.
2. Trained
COs and FAs in the pilot areas of three districts. This goal is
reached by activities including: Preparation of a course on O&M using
existing Manuals/Guidelines for COs and FAs. Installation of monitoring systems
at field level that will be monitored by COs and FAs and the storage and
processing of the data in the data base, as well as analysing and
interpretation of the results. Evaluation missions for O&M visiting project
areas 3 times. A measurable indicator will be the presence of at least 24
qualified COs and FAs in the three districts.
3. Mechanized
Maintenance tried out in secondary and tertiary canals. This
goal is reached by activities including: assessment of O&M problems for
mechanized maintenance, the selection of the implementing organization for
mechanized maintenance the selection and delivery of the most effective
equipment at secondary and tertiary level, the introduction and demonstration
of this equipment and training of personnel that will operate the mechanized
maintenance equipment and machines. Of importance will be the assessment of the
costs of mechanized maintenance in the pilot areas in South Sumatra and the
equipment/training needs. These inputs and goals depend on the external
condition that the District Government will buy 2 excavators for mechanized
routine and periodic maintenance before 1 August 2007, or on the possibility to
rent appropriate excavators at an earlier stage. An important indicator will be
the successful introduction of the possibility for effective mechanised
maintenance of the secondary and tertiary canals.
Project Component III. The goals are expressed by the implementation of
solutions for limitations on the cultivation of two crops a year and the
increase of production. Special attention will be paid to the new pilot areas
in West Kalimantan, but also in the South Sumatra pilot areas attention will be
given to solutions, based on elaboration of the experiences in the LWMTL
project to increase yields and especially the problems to be solved to grow two
crops per year. Intermediate results for this goal are reached by:
1. Increased
crop production in the pilot areas. This goal is
reached by activities including: assessment of limiting factors for the present
low crop production in West Kalimantan in relation to needed
agricultural/processing/marketing inputs. Further by making an assessment of
the sustainability of the technology to be implemented. A measurable indicator
would be that farmers have higher yields based on the new technology. This
applies to the pilot areas in the three districts;
2. Assessment
of limitations for growing two crops per year. This goal is
reached by activities including: a Rapid Rural Appraisal (RRA) followed by
several Participatory Rural Appraisals (PRA) in the pilot areas of West
Kalimantan, including a base-line survey carried out by the COs. A measurable
indicator would be a report concerning the potentials to the District
Government within 3 months after the start of the project for the pilot areas
in the two Districts of West Kalimantan (Sambas, Pontianak);
3. Scheduling
of activities to cultivate two crops per year. This goal is
reached by activities including: application, training and testing with farmers
of manuals and latest experiences of the Indonesian Institute for Rice Research
(IIRR). Discussions of farmers groups and Government, assessment of needed
investment and assistance by Government. A measurable indicator would be the
presence of an Integrated Water Management/Crop plan with farmers groups. This
applies to the pilot areas in the three districts.
For these three project components a budget of Euro 654,998 has been proposed
mostly covering the costs for the mechanized maintenance equipment and
activities in the pilot areas.